[et_pb_background_plus _builder_version=”3.21.1″ level=”section” z_index_tablet=”500″ use_background_color_gradient=”on” background_color_gradient_start=”rgba(48,48,48,0.19)” background_color_gradient_end=”rgba(246,246,246,0)” background_color_gradient_direction=”176deg” background_color_gradient_end_position=”70%” /]
Redmond Campus Project
Redmond, Washington
Project: Waterproofing Restoration – 70,000 SF
Completion: 3rd Qtr, 2018
[et_pb_background_plus _builder_version=”3.21.1″ level=”section” z_index_tablet=”500″ background_color_gradient_start=”rgba(48,48,48,0.19)” background_color_gradient_end=”rgba(246,246,246,0)” background_color_gradient_direction=”176deg” background_color_gradient_end_position=”70%” background_color=”rgba(48,48,48,0.25)” /]
Redmond Campus Project
Redmond, Washington
Project: Waterproofing Restoration – 70,000 SF
Completion: 3rd Qtr, 2018
Overview
In the summer of 2018, we performed a full plaza and planter waterproofing restoration at an office campus in Redmond, WA. All of the existing waterproofing was removed and replaced with a new 20-year waterproof membrane.