[et_pb_background_plus _builder_version=”3.21.1″ level=”section” z_index_tablet=”500″ use_background_color_gradient=”on” background_color_gradient_start=”rgba(48,48,48,0.19)” background_color_gradient_end=”rgba(246,246,246,0)” background_color_gradient_direction=”176deg” background_color_gradient_end_position=”70%” /]
Sculpture Park Project
Seattle, Washington
Project: New Construction Sealants – 9,700 ln ft
Completion: Completion – 4th Qtr, 2006
[et_pb_background_plus _builder_version=”3.21.1″ level=”section” z_index_tablet=”500″ background_color_gradient_start=”rgba(48,48,48,0.19)” background_color_gradient_end=”rgba(246,246,246,0)” background_color_gradient_direction=”176deg” background_color_gradient_end_position=”70%” background_color=”rgba(48,48,48,0.25)” /]
Sculpture Park Project
Seattle, Washington
Project: New Construction Sealants – 9,700 ln ft
Client:
Completion: Completion – 4th Qtr, 2006
Overview
The park consists of a 9-acre outdoor sculpture museum and beach with a visitors center on site. We installed shop glazed silicone structural sealants and in-field perimeter sealants with a backer rod, plus sealants and backer rod at precast panels in the park.